Quick Details
Place of Origin: |
Qingdao, China (Mainland)
|
Brand Name: |
AT
|
Model Number: |
AT G12.9 Screw
|
Standard: |
ISO
|
Certificate: |
ISO9001:2008 CE
|
MOQ: |
1000
|
Packaging & Delivery
Packaging Details: |
All products can be packaged according to customer requirements transportation.
Or our existing packaging, labeling packaging.
To ensure product safety and anti-corruption. |
Delivery Detail: |
Commonly 7-10 days,actual according to production status identif |
SIZE:
Product Show:
Package:
ABOUT US:
OEM or ODM metal sheet fabrication, custom sheet metal fabrication, sheet metal fabrication, sheet metal shielding box , sheet metal shielding case
1. sheet metal fabrication shielding box case strictly according to customer's drawing,packing and quality request
2. advanced machines make sure the precise tolerance +/-0.01 mm
3. experienced technology engineers and well trained workers
4. strict QC flow and advanced CMM inspector to assure qualified product
5. Fast and timely delivery
6. Quality assurance in accordance with ISO9001
Product inspection
Assurance:
100% quality manufacturing.
We guarantee that our products meet your supplied specifications
Extremely competitive pricing
Delivery to your port or front door
4 ---- 8 week lead times
We handle all paperwork
Partial container orders
Flexible payment options
Unique tooling options
Full range of packaging options from bulk to retail ready
Complete testing services available
FAQs:
1. How long has the company been established?
AT INDUSTRY was established in 2009. There is 7 years exporting experiences.
2. What proportion of your goods are exported?
100% of our production are exported to all over the world.
3. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and does not include the transportation time.
4. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to ensure the developing schedule---Design pattern, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.
5. How long is the manufacturing lead time?
Mass Production: 90days after sample approval by yours.
The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
6. What are the payment terms?
Payment terms are negotiable and will improve for long term customers.
During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.
Production orders can be negotiable. We prefer 50% deposit and the balance by T/T before sails. But sometimes T/T 30 days after sails would also acceptable.
We are professional suppliers on high quality fasteners,insisted on the principle of high quality and the best service. Our products and service have extended to Europe, East Asia, North America, middle east and all over the world.